Information on parameters of Unit 1-4, today on February 22nd 2008at7:00hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 97 %, Turbine generator output – 432 MWe
Unit 3 is in Mode 2 – startup-criticality achieving and reactor critical
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 454 MWe
Electricity production since the beginning of the year: 2 052 806 MWh.