19. 1. 2007

Information on Dukovany NPP, January 19th 2007

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 266 428 057 MWh.

Information on parameters of Unit 1-4, today on January 19th 2007 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 74%, Turbine generator output – 300 MWe

 

Unit 2 is in Mode 1 – power conditions: Reactor power is 90%, Turbine generator output – 394 MWe

 

Unit 3 is in Mode 1 – power conditions: Reactor power is 97,3%, Turbine generator output - 450 MWe

 

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 463 MWe

 

 

 

 

Electricity production since the beginning of the year: 630 900 MWh.