19. 1. 2009

Information on Dukovany NPP, January 19th 2009

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 294 849 363 MWh.

Information on parameters of Unit 1-4, today on January 19th 2009 at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe

Unit 3 is in Mode 6 – refueling – shutdown with primary circuit open

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 455 MWe

 

Electricity production since the beginning of the year: 697 515 MWh.