Information on parameters of Unit 1-4, today on January 30th 2008 at 7:00hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 446 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 89,5 %, Turbine generator output – 411 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 99,5 %, Turbine generator output – 468 MWe
Electricity production since the beginning of the year: 1 263 283MWh.