7. 1. 2009

Information on Dukovany NPP, January 7th 2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 294 417 714 MWh.

Information on parameters of Unit 1-4, today on January 7th 2009 at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 470 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 92,3 %, Turbine generator output – 4293 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

 

 

Electricity production since the beginning of the year: 265 866 MWh.