8. 1. 2009

Information on Dukovany NPP, January 8th 2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 294 461 690 MWh.

Information on parameters of Unit 1-4, today on January 8th 2009 at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 469 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 91,2 %, Turbine generator output – 425 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

 

Electricity production since the beginning of the year: 309 382 MWh.