Information on parameters of Unit 1-4, today on March 13th 2008 at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe
Unit 2 is in Mode 6 – refueling – shutdown with primary circuit open
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 465 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 458 MWe
Electricity production since the beginning of the year: 2 854 872 MWh.