27. 3. 2007

Information on Dukovany NPP, March 27th 2007

Units 1,3,4 are operated at full rated power. Unit 2 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 268 928 456 MWh.

Information on parameters of Unit 1-4, today on March 27th 2007 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 450 MWe

Unit 2 is in Mode 6 – refueling – shutdown with primary circuit open

Unit 3 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 466 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 466 MWe

 

 

Electricity production since the beginning of the year: 3 131 299 MWh.