31. 3. 2008

Information on Dukovany NPP, March 31rd 2008

Units 1, 3, 4 are operated at full rated power. Unit 2 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 283 164 560 MWh

Information on parameters of Unit 1-4, today on  March 31rd 2008at7:00hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

Unit 2is in Mode 7 – total fuel removal from reactor core

Unit 3is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 4is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

 

Electricity production since the beginning of the year: 3 460 260 MWh.