31. 3. 2006
Information on Dukovany NPP, March 31st 2006
Units 1,4 are operated at full rated power. Unit 2 is operated at temperature and power effect. Unit 3 is under equipment revision with refueling outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 255 393 243 MWh.