9. 3. 2006
Information on Dukovany NPP, March 9th 2006
Units 1,2,4 are operated at full rated power. Unit 3 is before the refueling outage so that it is operated with a lower power at a power effect. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 254 671 807 MWh.