10. 10. 2007

Information on Dukovany NPP, October 10th 2007

Units 2,3,4 are operated at full rated power. Unit 1 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 276 796 158 MWh.

Information on parameters of Unit 1-4, today on October 10th 2007 at 7:00 hrs:

Unit 1 is in Mode 7 - total fuel removal from reactor core

Unit 2 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 452 MWe

Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 462 MWe

Unit 4 is in Mode 1 - power conditions: Reactor power is 100%, Turbine generator output - 465 MWe

Electricity production since the beginning of the year: 10 999 001 MWh.