Information on parameters of Unit 1-4, today on October 1st 2007at7:00hrs:
Unit 1 is in Mode 7 – total fuel removal from reactor core
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 452 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 456 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 461 MWe
Electricity production since the beginning of the year: 10 702 529 MWh.