4. 5. 2009

Information on NPP Dukovany 04/05/2009

Units 1, 3, 4 are operated at full rated power. The Unit 2 is in a startup mode after refuelling. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 298 311 766 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 2 is in Mode 1 - The Unit is in a startup mode after refuelling, Reaktor power is 23%, Turbine generator output – 0 MWe

Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 99,6 %, Turbine generator output – 494 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe

 

 Electricity production since the beginning of the year:  4 159 918 MWh.

 

ng. Petr Spilka

Spokesman of the ČEZ Group

Nuclear Power Plant Dukovany