6. 5. 2009

Information on NPP Dukovany 06/05/2009

Units 1, 2, 3, 4 are operated at full rated power. The Unit 2 is in a startup mode after refuelling. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 298 390 871 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 2 is in Mode 1 - power conditions, Reaktor power is 98,5 %, Turbine generator output – 457 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 501 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

 

 Electricity production since the beginning of the year:  4 239 023 MWh.

 

Ing. Petr Spilka

Spokesman of the ČEZ Group

Nuclear Power Plant Dukovany