Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power operation, Reaktor power is 100 %, Turbine generator output – 467 MWe
- Unit 2 is in Mode 1 - power operation, Reaktor power is 100 %, Turbine generator output – 460 MWe
- Unit 3 is in Mode 6 - refueling – shutdown with primary circuit open
- Unit 4 is in Mode 7 – total fuel removal from reactor core
Electricity production since the beginning of the year: 12 659 553 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany