13. 10. 2009

Information on NPP Dukovany 13/10/2009

Units 2, 3, 4 are operated at full rated power. The Unit 1 is in a startup mode after refuelling. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 305 217 299 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 - power conditions, Reaktor power is   30 %, Turbine generator output - 112 MWe
  • Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output - 463 MWe
  • Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 504 MWe
  • Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 466 MWe

 

 Electricity production since the beginning of the year:  11 065 451 MWh.

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany