18. 2. 2022

INFORMATION ON NPP DUKOVANY 18/2/2022

Units 2, 3, 4 are in the operation. Unit 1 is in the stable operation on decreased power. Electricity production since the beginning of the operation: 478 851 722 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - stable operation on decreased power, Reactor power is 88,5 %, Turbine generator output - 432 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
 

Electricity production since the beginning of the year: 1 802 169 MWh.