INFORMATION ON NPP DUKOVANY 06/04/2022

Units 2, 3, 4 are in the operation. The Unit 1 is in a startup mode after refuelling. Electricity production since the beginning of the operation: 480 537 613 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - startup mode, Reactor power is 80 %, Turbine generator output - 374 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
 

Electricity production since the beginning of the year: 3 488 060 MWh.