16. 11. 2022

Information on NPP DUKOVANY 16/11/2022

Units 1, 2, 4 are in the operation. The Unit 3 is in the startup mode after refuelling. Electricity production since the beginning of the operation: 489 593 486 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 497 MWe
Unit 3 is in Mode 1 - startup mode, Reactor power is 19 %, Turbine generator output - 35 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe

 

Electricity production since the beginning of the year: 12 543 932 MWh.