18. 12. 2009

Information on NPP Dukovany 18/12/2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 307 510 028 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 1 – power conditions, Reaktor power is 100 %, Turbine generator output – 469 MWe
  • Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 464 MWe
  • Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output – 499 MWe
  • Unit 4 is in Mode 1 – The Unit is in a startup mode after refuelling, Reactor power is 19,7 %, Turbine generator output – 23 MWe

 

 

Electricity production since the beginning of the year:  13 358 180 MWh.

 

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany