19. 9. 2023

Information on NPP DUKOVANY 20/9/2023

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 502 236 189 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 484 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 485 MWe
Unit 4 is in Mode 1 - stable operation on thermal and power effect, Reactor power is 93 %, Turbine generator output - 453 MWe

Electricity production since the beginning of the year: 10 459 358 MWh.