4/3/2024
Information on NPP DUKOVANY 3/4/2024
Units 1, 2, 4 are in the operation. Unit 3 is in a startup mode after refuelling. Electricity production since the beginning of the operation: 509 649 350 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Unit 3 is in Mode 1 - startup mode after refuelling, Reactor power is 20,6 %, Turbine generator output - 60 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Electricity production since the beginning of the year: 3 545 251 MWh.