13. 5. 2024

Information on NPP DUKOVANY 13/5/2024

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 511 512 169 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 2 is in Mode 1 - stable operation on thermal and power effect, Reactor power is 94,2 %, Turbine generator output - 465 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe

Electricity production since the beginning of the year: 5 408 070 MWh.