26. 7. 2024

Information on NPP DUKOVANY 26/07/2024

Units 1, 3, 4 are in the operation. Unit 2 is in planned outage. Electricity production since the beginning of the operation: 514 234 521 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 482 MWe
Unit 2 is in Mode 6 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe

Electricity production since the beginning of the year: 8 130 421 MWh.