20. 8. 2024

Information on NPP DUKOVANY 20/08/2024

Units 2, 3, 4 are in the operation. Unit 1 is in planned outage. Electricity production since the beginning of the operation: 515 242 519 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe

Electricity production since the beginning of the year: 9 138 420 MWh.