8. 6. 2023

Information on NPP DUKOVANY 8/6/2023

Units 2, 3, 4 are in the operation. Unit 1 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 498 439 704 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operationReactor power is 100 %, Turbine generator output - 490 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489,4 MWe

 

Electricity production since the beginning of the year: 6 662 873 MWh.