9. 10. 2024

Information on NPP DUKOVANY 09/10/2024

Units 2, 3, 4 are in the operation. Unit 1 is in planned outage. Electricity production since the beginning of the operation: 517 028 077 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe

Electricity production since the beginning of the year: 10 923 978 MWh.