27. 7. 2023

Information on NPP DUKOVANY 27/7/2023

Units 2, 3, 4 are in the operation. Unit 1 is in the planned outages. Electricity production since the beginning of the operation: 499 891 680 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe

 

Electricity production since the beginning of the year: 8 114 850 MWh.