2. 4. 2025

Information on NPP DUKOVANY 2/4/2025

Units 1, 2, 4 are in the operation. The Unit 3 is in the outage. Electricity production since the beginning of the operation: 524 133 778 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 513 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 506 MWe
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 518 MWe

Electricity production since the beginning of the year: 3 338 599 MWh.