25. 2. 2025

Information on NPP DUKOVANY 25/2/2025

Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage. Electricity production since the beginning of the operation: 522 817 590 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
Unit 4 is in Mode 5 - outage

Electricity production since the beginning of the year: 2 022 411 MWh.