3. 3. 2025

Information on NPP DUKOVANY 03/3/2025

Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage. Electricity production since the beginning of the operation: 523 036 270 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 516 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489 MWe
Unit 4 is in Mode 4 - outage

Electricity production since the beginning of the year: 2 241 091 MWh.