Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 460 MWe
Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output - 459 MWe
Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 461 MWe
Electricity production since the beginning of the year: 9 409 296 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany