1. 7. 2021

Information on NPP Dukovany 1/7/2021

Units 1, 2, 4 are operated on power operation. Unit 3 is in planned outage. Electricity production since the beginning of the operation: 469 183 067 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 484 MWe 
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 488 MWe
 

Electricity production since the beginning of the year: 7 001 574 MWh.