29. 5. 2006

Information on NPP Temelín 103/2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

May 29, 2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on May 29, 2006 at 07:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 3 351 943 MWh

Information on parameters at Unit 2 today on May 29, 2006 at 07:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 978 MW
· Electricity production since the beginning of the year: 2 739 669 MWh

Milan Nebesář
Spokesman of the Temelín NPP