17. 1. 2024

INFORMATION ON NPP TEMELÍN 12 / 2024

Both Unit 1 and 2 is in the operation. The turbogenerator of the Unit 1 is disconnected from the grid. The reason is a false signal of the protection of the 6 kV substation. The reactor remains in the operation at twenty percent capacity. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 0 MWe
  • Electricity production since the beginning of the year: 396 688 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 392 787 MWh