28. 6. 2018

INFORMATION ON NPP TEMELÍN 124 / 2018

The Unit 1 is in operation at full rated power. According to the plan Unit 2 operates in the power effect of reactivity mode. During this period, the reactor power will be slowly decreased till about 90 % RTP. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1074 MWe
  • Electricity production since the beginning of the year: 3 042 612 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 941 MWe
  • Electricity production since the beginning of the year: 4 620 653 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín