29. 6. 2018

INFORMATION ON NPP TEMELÍN 125 / 2018

The first unit is in operation at full rated power. The second unit is in operation on so-called power effect. During this time, the reactor output is slowly reduced below 90 percent and is preparing for outage which starts tomorrow (Saturday 30 June 2018). The auxiliary systems of the plant are working according to the operating needs of the units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1074 MWe
  • Electricity production since the beginning of the year: 3 068 476 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 931 MWe
  • Electricity production since the beginning of the year: 4 643 208 MWh