9. 7. 2024

INFORMATION ON NPP TEMELÍN 129 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1062 MWe
  • Electricity production since the beginning of the year: 3 054 976 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1001 MWe
  • Electricity production since the beginning of the year: 4 703 246 MWh