15. 7. 2024

INFORMATION ON NPP TEMELÍN 133 / 2024

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Reactor - 100 %
  • Turbine generator output – 1067 MWe
  • Electricity production since the beginning of the year: 3 209 400 MWh

 

Information on parameters at Unit 2:

  • Unit is in operation
  • Reactor - 34 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 4 856 884 MWh