15. 7. 2008

Information on NPP Temelín 137 / 2008

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on July 15, 2008 at 11:00 o‘clock:

  • Unit is in Mode 1 -  power operation
  • Reactor power is 100 %
  • Turbine generator output - 1012 MWe
  • Electricity production since the beginning of the year: 4 059 681 MWh

Information on parameters at Unit 2 today on July 15, 2008 at 11:00 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 1010 MWe
  • Electricity production since the beginning of the year:  3 342 507 MWh

 

Václav Brom
Spokesman of the ČEZ GROUP
Temelín NPP