19. 1. 2007
Information on NPP Temelín 14 / 2006
Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 979 MWe
· Electricity production since the beginning of the year: 396 146 MWh Information on parameters at Unit 2 today on January 19, 2007 at 09:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1010 MWe
· Electricity production since the beginning of the year: 437 339 MWh Milan Nebesář
Spokesman of the ČEZ GROUP Temelín NPP