7. 8. 2024

INFORMATION ON NPP TEMELÍN 150 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1049 MWe
  • Electricity production since the beginning of the year: 3 757 914  MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1035 MWe
  • Electricity production since the beginning of the year: 5 265 971 MWh