12. 8. 2024

INFORMATION ON NPP TEMELÍN 153 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1050 MWe
  • Electricity production since the beginning of the year: 3 883 992  MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1073 MWe
  • Electricity production since the beginning of the year: 5 387 856 MWh