31. 7. 2007

Information on NPP Temelín 148 / 2007

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

July 31, 2007

Information on parameters at Unit 1 today on July 31, 2007 at 09:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 981 MWe
· Electricity production since the beginning of the year: 2 874 365 MWh

Information on parameters at Unit 2 today on July 31, 2007 at 09:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 100 %
· Turbine generator output - 1012 MW
· Electricity production since the beginning of the year: 3 399 149 MWh

Ing. Marek Sviták
Spokesman of the CEZ Group
Temelín NPP