20. 1. 2006

Information on NPP Temelín 15 / 2006

The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor. All auxiliary systems are working in accordance with the operation needs of individual units.

January 20, 2006

Information on parameters at Unit 1 today on January 20, 2006 at 09:15 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97%
· Turbine generator output - 976 MW
· Electricity production since the beginning of the year: 435 669 MWh

Information on parameters at Unit 1 today on January 20, 2006 at 09:15 o‘clock:
· Unit is in Mode 5
· Reactor power is 0%
· Turbine generator output - 0 MW
· Electricity production since the beginning of the year: 54 079 MWh

Milan Nebesář Spokesman of the Temelín NPP