14. 8. 2024

INFORMATION ON NPP TEMELÍN 155 / 2024

The Unit 1 is in the operation. The Unit 2 is disconnected from the transmission grid due to automatic effect of electrical switchboard protection. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1050 MWe
  • Electricity production since the beginning of the year: 3 934 909 MWh

 

Information on parameters at Unit 2:

  • Unit is disconnected from the grid
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 5 424 209 MWh