INFORMATION ON NPP TEMELÍN 156 / 2020

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1
  • Unit is in operation
  • Turbine generator output – 1064 MWe
  • Electricity production since the beginning of the year: 4 051 129 MWh
Information on parameters at Unit 2
  • Unit is in operation
  • Turbine generator output - 1048 MWe
  • Electricity production since the beginning of the year: 4 318 430 MWh