20. 8. 2024

INFORMATION ON NPP TEMELÍN 159 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1050 MWe
  • Electricity production since the beginning of the year: 4 086 226 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1075 MWe
  • Electricity production since the beginning of the year: 5 521 289 MWh