26. 8. 2024

INFORMATION ON NPP TEMELÍN 163 / 2024

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1048 MWe
  • Electricity production since the beginning of the year: 4 237 851 MWh

 

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1080 MWe
  • Electricity production since the beginning of the year: 5 675 612 MWh